Green Bay, WI
ORCHESTRA PIT
4 devices · 2710 Lineville Rd, Green Bay, WI
Work history
Who worked this, and when · ProInspection
Last inspected May 13, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1999 · Schindler · Direct Hydraulic · 2,100 lb · 125 fpm · last inspected May 13, 2026
- Wheelchair lift · installed 1999 · National-Wheel-o-Vator · Chained Hydraulic · 750 lb · 7 fpm · last inspected May 13, 2026
- Wheelchair lift · installed 2000 · National-Wheel-o-Vator · Direct Hydraulic · 750 lb · 9 fpm · last inspected May 13, 2026
- Wheelchair lift · installed 1999 · National-Wheel-o-Vator · Chained Hydraulic · 750 lb · 7 fpm · last inspected May 13, 2026