Hartland, WI
ARROWHEAD UNION HIGH SCHOOL CAMPUS
5 devices · 700 North Ave, Hartland, WI
Work history
Who worked this, and when · ProInspection
Last inspected Oct 29, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2010 · Schindler · Direct Hydraulic · 2,100 lb · 123 fpm · last inspected Oct 29, 2025
- Passenger · installed 1993 · Dover · Direct Hydraulic · 2,500 lb · 100 fpm · last inspected Oct 29, 2025
- Elevator (unspec.) · Chained Hydraulic · 750 lb · 20 fpm
- Elevator (unspec.) · Roped Hydraulic · 750 lb · 16 fpm
- Wheelchair lift · Bella - Symmetry · Screw · 750 lb · 20 fpm · last inspected Oct 29, 2025