GREENVILLE, NC
ECU FLANAGAN BLDG
3 devices · EAST FIFTH ST, GREENVILLE, NC, 27858
Work history
Who worked this, and when · ProInspection
Last inspected Apr 8, 2026 · status 2
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1987 · SOUTHERN · HYDRAULIC · 3,500 lb · 150 fpm · 3 stops · last inspected Oct 27, 2025 · 2
- Passenger · installed 1971 · SOUTHEASTERN · HYDRAULIC · 5,000 lb · 50 fpm · 3 stops · last inspected Mar 31, 2026 · 2
- Passenger · installed 1980 · THYSSEN KRUPP · HYDRAULIC · 2,100 lb · 100 fpm · 3 stops · last inspected Apr 8, 2026 · 2