GOLDSBORO, NC
DART CHERRY PROGRAM BD. C
3 devices · 1302 W ASH ST, GOLDSBORO, NC, 27530
Work history
Who worked this, and when · ProInspection
Last inspected Apr 27, 2026 · status 2
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1982 · THYSSEN KRUPP · HYDRAULIC · 2,500 lb · 100 fpm · 2 stops · last inspected Apr 27, 2026 · 2
- Passenger · installed 1982 · THYSSEN KRUPP · HYDRAULIC · 2,500 lb · 100 fpm · 2 stops · last inspected Apr 27, 2026 · 2
- Passenger · installed 1969 · SOUTHERN · HYDRAULIC · 1,800 lb · 75 fpm · 2 stops · last inspected Apr 27, 2026 · 2