CHAPEL HILL, NC
COGENERATION BOILER PLANT
6 devices · 501 W. CAMERON AVE., CHAPEL HILL, NC, 27514
Work history
Who worked this, and when · ProInspection
Last inspected Jun 8, 2026 · status 2
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1991 · ASK · TRACTION · 6,000 lb · 350 fpm · 6 stops · last inspected Jun 8, 2026 · 2
- Passenger · installed 1993 · ASK · HYDRAULIC · 2,500 lb · 100 fpm · 2 stops · last inspected Jun 8, 2026 · 2
- Freight · installed 1993 · ASK · HYDRAULIC · 16,000 lb · 50 fpm · 3 stops · last inspected Jun 8, 2026 · 2
- Other · installed 2003 · ALIMAK · 900 lb · 128 fpm · 2 stops · last inspected Jun 8, 2026 · 3
- Wheelchair lift · installed 1993 · CHENEY · 750 lb · 12 fpm · 2 stops · last inspected Jun 8, 2026 · 2
- Wheelchair lift · installed 1993 · CHENEY · 750 lb · 12 fpm · 2 stops · last inspected Jun 8, 2026 · 2