MOORESBORO, NC
ROGERS ENERGY COMPLEX / DUKE ENERGY
7 devices · 573 DUKE POWER ROAD, MOORESBORO, NC, 28114
Work history
Who worked this, and when · ProInspection
Last inspected Aug 5, 2026 · status 2
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Other · installed 2012 · ALIMAK · 1,000 lb · 149 fpm · 3 stops · last inspected Jul 30, 2026 · 1
- Other · installed 2010 · ALIMAK · 1,000 lb · 149 fpm · 7 stops · last inspected Jul 30, 2026 · 1
- Other · installed 2011 · ALIMAK · 4,400 lb · 118 fpm · 7 stops · last inspected Jul 30, 2026 · 1
- Other · installed 2010 · ALIMAK · 900 lb · 147 fpm · 9 stops · last inspected Jul 30, 2026 · 1
- Passenger · installed 2011 · OTIS · TRACTION · 8,500 lb · 250 fpm · 14 stops · last inspected Jul 30, 2026 · 1
- Passenger · installed 2015 · TKE · HYDRAULIC · 4,500 lb · 80 fpm · 2 stops · last inspected Jul 30, 2026 · 1
- Other · installed 2017 · ALIMAK · 1,000 lb · 150 fpm · 4 stops · last inspected Aug 5, 2026 · 2