CONCORD, NC
CAROLINAS REHABILITATION
3 devices · 487 LAKE CONCORD DRIVE, CONCORD, NC, 28025
Work history
Who worked this, and when · ProInspection
Last inspected Apr 7, 2026 · status 1
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2013 · OTIS · HYDRAULIC · 5,000 lb · 125 fpm · 2 stops · last inspected Apr 7, 2026 · 1
- Passenger · installed 2013 · OTIS · HYDRAULIC · 5,000 lb · 125 fpm · 2 stops · last inspected Apr 7, 2026 · 1
- Passenger · installed 2013 · OTIS · HYDRAULIC · 5,000 lb · 125 fpm · 2 stops · last inspected Apr 7, 2026 · 1