CASTLE HAYNE, NC
NORTH CAMPUS BUILDING
5 devices · 4500 BLUE CLAY ROAD, CASTLE HAYNE, NC, 28429
Work history
Who worked this, and when · ProInspection
Last inspected Jun 2, 2026 · status 1
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2002 · OTIS · HYDRAULIC · 2,500 lb · 125 fpm · 3 stops · last inspected Jun 2, 2026 · 1
- Passenger · installed 2002 · OTIS · HYDRAULIC · 2,500 lb · 125 fpm · 3 stops · last inspected Aug 7, 2026 · 1
- Passenger · installed 2009 · OTIS · HYDRAULIC · 4,000 lb · 150 fpm · 2 stops · last inspected Jun 2, 2026 · 1
- Passenger · installed 2017 · OTIS · HYDRAULIC · 4,500 lb · 100 fpm · 2 stops · last inspected Jun 2, 2026 · 1
- Wheelchair lift · installed 2002 · CONCORD · 750 lb · 8 fpm · 2 stops · last inspected Jun 2, 2026 · 1