GREENSBORO, NC
ASHEVILLE OFFICE BLDG
3 devices · 1500 PINECROFT RD, GREENSBORO, NC, 27407
Work history
Who worked this, and when · ProInspection
Last inspected May 13, 2026 · status 2
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1988 · THYSSEN KRUPP · HYDRAULIC · 3,000 lb · 125 fpm · 5 stops · last inspected May 13, 2026 · 2
- Passenger · installed 1988 · THYSSEN KRUPP · HYDRAULIC · 3,000 lb · 125 fpm · 5 stops · last inspected May 13, 2026 · 2
- Passenger · installed 1988 · THYSSEN KRUPP · HYDRAULIC · 3,000 lb · 125 fpm · 5 stops · last inspected May 13, 2026 · 2