PALO ALTO, CA
WESTIN HOTEL
6 devices · 675 EL CAMINO REAL, PALO ALTO, CA, 94301
Work history
Who worked this, and when · ProInspection
Last inspected May 1, 2024
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2000 · hydroelectric · 4,500 lb · 130 fpm · 7 stops · last inspected May 1, 2024
- Passenger · installed 2000 · hydroelectric · 2,500 lb · 125 fpm · 4 stops · last inspected May 1, 2024
- Passenger · installed 2000 · hydroelectric · 4,000 lb · 150 fpm · 6 stops · last inspected May 1, 2024
- Passenger · installed 2000 · hydroelectric · 3,500 lb · 150 fpm · 6 stops · last inspected May 1, 2024
- Passenger · installed 2000 · hydroelectric · 3,500 lb · 150 fpm · 6 stops · last inspected May 1, 2024
- Passenger · installed 2000 · hydroelectric · 3,500 lb · 150 fpm · 3 stops · last inspected Oct 28, 2024