ORANGE, CA
ORANGE FINANCIAL CENTER
6 devices · 701 PARKER ST S, ORANGE, CA, 92868
Work history
Who worked this, and when · ProInspection
Last inspected Jun 30, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1985 · overhead traction · 3,500 lb · 350 fpm · 8 stops · last inspected Apr 7, 2026
- Passenger · installed 1985 · overhead traction · 3,000 lb · 350 fpm · 8 stops · last inspected Apr 7, 2026
- Passenger · installed 1985 · overhead traction · 3,000 lb · 350 fpm · 8 stops · last inspected Jun 30, 2026
- Passenger · installed 1985 · overhead traction · 2,000 lb · 350 fpm · 8 stops · last inspected Apr 7, 2026
- Passenger · installed 1985 · hydroelectric · 2,500 lb · 125 fpm · 4 stops · last inspected Apr 7, 2026
- Passenger · installed 1986 · hydroelectric · 2,500 lb · 125 fpm · 4 stops · last inspected Apr 7, 2026