SAN DIEGO, CA
CESAR CHAVEZ ELEM
3 devices · 1404 40TH ST S, SAN DIEGO, CA, 92113
Work history
Who worked this, and when · ProInspection
Last inspected Sep 25, 2024
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1997 · hydroelectric · 3,500 lb · 100 fpm · 2 stops · last inspected Sep 25, 2024
- Passenger · installed 2002 · Schindler Elevator Corporation · hydroelectric · 2,500 lb · 100 fpm · 2 stops · last inspected Sep 25, 2024
- Passenger · installed 2014 · TK Elevator Corporation · hydroelectric · 3,500 lb · 102 fpm · 2 stops · last inspected Sep 25, 2024