SAN PABLO, CA
1330 CONTRA COSTA AV
3 devices · 1330 CONTRA COSTA AV, SAN PABLO, CA, 94806
Work history
Who worked this, and when · ProInspection
Last inspected Jul 6, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1971 · hydroelectric · 1,200 lb · 80 fpm · 3 stops · last inspected Jul 6, 2026
- Passenger · installed 1971 · hydroelectric · 1,200 lb · 80 fpm · 3 stops · last inspected Jul 6, 2026
- Passenger · installed 1971 · hydroelectric · 1,200 lb · 80 fpm · 4 stops · last inspected Jul 6, 2026