OAKLAND, CA
LANEY COLLEGE
9 devices · 900 FALLON ST, OAKLAND, CA, 94607
Work history
Who worked this, and when · ProInspection
Last inspected Jan 7, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1970 · hydroelectric · 3,000 lb · 110 fpm · 4 stops · last inspected Apr 3, 2025
- Passenger · installed 1963 · overhead traction · 2,500 lb · 350 fpm · 10 stops · last inspected Apr 1, 2025
- Passenger · hydroelectric · 3,000 lb · 110 fpm · 4 stops · last inspected Jul 25, 2025
- Passenger · installed 1995 · overhead traction · 2,500 lb · 350 fpm · 10 stops · last inspected Apr 1, 2025
- Passenger · installed 1999 · hydroelectric · 3,500 lb · 125 fpm · 4 stops · last inspected Nov 6, 2025
- Elevator (unspec.) · installed 2004 · National W heet-Vator Co. · roped hydro · 1,400 lb · 30 fpm · 3 stops · last inspected Jan 7, 2026
- Passenger · installed 2011 · Otis Elevator Company · hydroelectric · 2,500 lb · 125 fpm · 2 stops · last inspected Apr 3, 2025
- Passenger · installed 2012 · Elevadores EV International S.A. de C.V. · hydroelectric · 2,500 lb · 125 fpm · 2 stops · last inspected Apr 3, 2025
- Passenger · installed 2012 · Elevadores EV International S.A. de C.V. · hydroelectric · 2,500 lb · 125 fpm · 2 stops · last inspected Nov 6, 2025