SAN FRANCISCO, CA
GATEWAY CHARTER H.S./KIPP SF BAY
3 devices · 1430 SCOTT ST, SAN FRANCISCO, CA, 94115
Work history
Who worked this, and when · ProInspection
Last inspected Jun 24, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1991 · hydroelectric · 3,000 lb · 130 fpm · 3 stops · last inspected Jun 24, 2026
- Wheelchair lift · installed 1999 · McKinley Equipment Corporation · screwdrive · 750 lb · 9 fpm · 2 stops · last inspected Dec 13, 2024
- Wheelchair lift · installed 2011 · Garaventa Ltd. · roped hydro · 750 lb · 17 fpm · 2 stops · last inspected Aug 7, 2024