CULVER CITY, CA
THE H.E.L.P. GROUP
4 devices · 12099 WASHINGTON BL W, CULVER CITY, CA, 90066
Work history
Who worked this, and when · ProInspection
Last inspected Jan 5, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1987 · hydroelectric · 2,500 lb · 125 fpm · 4 stops · last inspected Jan 5, 2026
- Passenger · installed 1987 · hydroelectric · 3,500 lb · 125 fpm · 4 stops · last inspected Jan 5, 2026
- Wheelchair lift · installed 2013 · Garaventa Ltd. · roped hydro · 750 lb · 17 fpm · 2 stops · last inspected Jan 5, 2026
- Passenger · installed 2013 · Mitsubishi Electric US, Inc . · hydroelectric · 3,500 lb · 150 fpm · 4 stops · last inspected Jan 5, 2026