SAN RAFAEL, CA
THE MERIDIAN
3 devices · 400 CANAL ST, SAN RAFAEL, CA, 94901
Work history
Who worked this, and when · ProInspection
Last inspected Apr 16, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1963 · hydroelectric · 1,200 lb · 70 fpm · 4 stops · last inspected Apr 16, 2026
- Passenger · installed 1977 · hydroelectric · 1,200 lb · 70 fpm · 3 stops · last inspected Apr 16, 2026
- Passenger · installed 1964 · hydroelectric · 1,200 lb · 70 fpm · 4 stops · last inspected Apr 16, 2026