RIALTO, CA
TARGET DISTRIBUTION
4 devices · 3105 MANGO AV N, RIALTO, CA, 92377
Work history
Who worked this, and when · ProInspection
Last inspected Mar 24, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2005 · Schindler Elevator Corporation · hydroelectric · 3,000 lb · 100 fpm · 2 stops · last inspected Jun 5, 2026
- Passenger · installed 2005 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 100 fpm · 2 stops · last inspected Mar 24, 2026
- Passenger · installed 2005 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 100 fpm · 2 stops · last inspected Jun 5, 2026
- Passenger · installed 2005 · Schindler Elevator Corporation · hydroelectric · 2,500 lb · 100 fpm · 2 stops · last inspected Jun 5, 2026