COSTA MESA, CA
3400 AVE OF THE ARTS
19 devices · 3400 AV OF THE ARTS, COSTA MESA, CA, 92626
Work history
Who worked this, and when · ProInspection
Last inspected Apr 1, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1986 · hydroelectric · 2,500 lb · 150 fpm · 6 stops · last inspected Apr 3, 2026
- Passenger · installed 1987 · hydroelectric · 2,500 lb · 150 fpm · 6 stops · last inspected Apr 3, 2026
- Passenger · installed 1987 · hydroelectric · 2,500 lb · 150 fpm · 6 stops · last inspected Apr 3, 2026
- Passenger · installed 1987 · hydroelectric · 2,500 lb · 125 fpm · 6 stops · last inspected Apr 3, 2026
- Passenger · installed 1987 · Capitol Elevator Company, Inc. · hydroelectric · 2,500 lb · 150 fpm · 6 stops · last inspected Apr 1, 2026
- Passenger · installed 1987 · hydroelectric · 2,500 lb · 150 fpm · 6 stops · last inspected Apr 1, 2026
- Passenger · installed 1987 · hydroelectric · 2,500 lb · 125 fpm · 6 stops · last inspected Apr 3, 2026
- Passenger · installed 1987 · Capitol Elevator Company, Inc. · hydroelectric · 2,500 lb · 125 fpm · 6 stops · last inspected Apr 3, 2026
- Passenger · installed 1987 · hydroelectric · 2,500 lb · 130 fpm · 6 stops · last inspected Apr 3, 2026
- Passenger · installed 1987 · hydroelectric · 2,500 lb · 130 fpm · 6 stops · last inspected Apr 3, 2026
- Passenger · installed 1987 · Capitol Elevator Company, Inc. · hydroelectric · 2,500 lb · 130 fpm · 3 stops · last inspected Apr 1, 2026
- Passenger · installed 1987 · hydroelectric · 2,500 lb · 130 fpm · 6 stops · last inspected Apr 1, 2026
- Passenger · installed 1987 · hydroelectric · 2,500 lb · 130 fpm · 6 stops · last inspected Apr 1, 2026
- Passenger · installed 1987 · hydroelectric · 2,500 lb · 140 fpm · 6 stops · last inspected Apr 3, 2026
- Passenger · installed 1987 · hydroelectric · 2,500 lb · 140 fpm · 6 stops · last inspected Apr 3, 2026
- Passenger · installed 1987 · hydroelectric · 2,500 lb · 130 fpm · 6 stops · last inspected Apr 3, 2026
- Passenger · installed 1987 · hydroelectric · 2,500 lb · 130 fpm · 6 stops · last inspected Apr 3, 2026
- Passenger · installed 1987 · hydroelectric · 2,500 lb · 130 fpm · 6 stops · last inspected Apr 1, 2026
- Passenger · installed 1987 · Capitol Elevator Company, Inc. · hydroelectric · 2,500 lb · 130 fpm · 6 stops · last inspected Apr 1, 2026