OCEANSIDE, CA
A-1 STORAGE
5 devices · 3040 OCEANSIDE BL, OCEANSIDE, CA, 92054
Work history
Who worked this, and when · ProInspection
Last inspected Feb 10, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Other · installed 1990 · Pflow (VRC) · roped hydro · 1,500 lb · 20 fpm · 2 stops · last inspected Feb 10, 2026
- Other · installed 2001 · AJAY Equipment Corporation · hydroelectric · 2,000 lb · 21 fpm · 3 stops · last inspected Feb 10, 2026
- Other · installed 2001 · AJAY Equipment Corporation · hydroelectric · 2,000 lb · 21 fpm · 3 stops · last inspected Feb 10, 2026
- Other · installed 2001 · hydroelectric · 2,000 lb · 21 fpm · 2 stops · last inspected Feb 10, 2026
- Other · installed 2001 · hydroelectric · 2,000 lb · 21 fpm · 2 stops · last inspected Feb 10, 2026