SAN FRANCISCO, CA
1650 HOLLOWAY AV
6 devices · 1650 HOLLOWAY AV, SAN FRANCISCO, CA, 94132
Work history
Who worked this, and when · ProInspection
Last inspected Apr 22, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1973 · hydroelectric · 4,000 lb · 100 fpm · 5 stops · last inspected Apr 22, 2025
- Passenger · installed 1973 · hydroelectric · 2,500 lb · 100 fpm · 2 stops · last inspected Mar 19, 2026
- Passenger · installed 1973 · hydroelectric · 3,500 lb · 100 fpm · 4 stops · last inspected May 15, 2026
- Passenger · installed 1973 · hydroelectric · 3,500 lb · 100 fpm · 4 stops · last inspected Nov 14, 2025
- Wheelchair lift · installed 2000 · McKinley Equipment Corporation · screwdrive · 750 lb · 9 fpm · 2 stops · last inspected Mar 19, 2026
- Passenger · installed 1973 · hydroelectric · 3,000 lb · 100 fpm · 5 stops · last inspected Apr 22, 2025