CORCORAN, CA
STATE PRISON
9 devices · 4001 KING AV, CORCORAN, CA, 93212
Work history
Who worked this, and when · ProInspection
Last inspected Jun 19, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Other · installed 1988 · hydroelectric · 500 lb · 10 fpm · 2 stops · last inspected Jun 19, 2025
- Other · installed 1988 · hydroelectric · 500 lb · 10 fpm · 2 stops · last inspected Jun 19, 2025
- Other · installed 1988 · hydroelectric · 500 lb · 10 fpm · 2 stops · last inspected Jun 19, 2025
- Other · installed 1988 · hydroelectric · 500 lb · 10 fpm · 2 stops · last inspected Jun 19, 2025
- Other · installed 1988 · hydroelectric · 500 lb · 10 fpm · 2 stops · last inspected Jun 19, 2025
- Other · installed 1988 · hydroelectric · 500 lb · 10 fpm · 2 stops · last inspected Jun 19, 2025
- Other · installed 1992 · Pflow (VRC) · hydroelectric · 500 lb · 25 fpm · 2 stops · last inspected Jun 19, 2025
- Other · installed 1992 · Pflow (VRC) · hydroelectric · 500 lb · 24 fpm · 2 stops · last inspected Jun 19, 2025
- Passenger · installed 2013 · KONE Inc. · overhead traction · 2,000 lb · 150 fpm · 2 stops · last inspected Jun 19, 2025