STOCKTON, CA
STEAM BOAT LANDING
4 devices · 25 COMMERCE ST S, STOCKTON, CA, 95202
Work history
Who worked this, and when · ProInspection
Last inspected Jun 8, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1982 · hydroelectric · 2,500 lb · 125 fpm · 3 stops · last inspected Jun 8, 2026
- Passenger · installed 1982 · hydroelectric · 2,500 lb · 125 fpm · 3 stops · last inspected Jun 8, 2026
- Passenger · installed 1982 · hydroelectric · 2,500 lb · 125 fpm · 3 stops · last inspected Jun 8, 2026
- Passenger · installed 1982 · hydroelectric · 2,100 lb · 125 fpm · 2 stops · last inspected Jun 8, 2026