SOUTH SAN FRANCISCO, CA
PARKWAY MIDDLE SCHOOL
3 devices · 650 SUNSET AVE, SOUTH SAN FRANCISCO, CA, 94080
Work history
Who worked this, and when · ProInspection
Last inspected Aug 27, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Wheelchair lift · installed 2002 · McKinley Equipment Corporation · screwdrive · 750 lb · 9 fpm · 2 stops · last inspected Aug 28, 2025
- Passenger · installed 2015 · Otis Elevator Company · hydroelectric · 3,500 lb · 125 fpm · 2 stops · last inspected Aug 27, 2025
- Passenger · installed 2015 · Otis Elevator Company · hydroelectric · 3,500 lb · 125 fpm · 2 stops · last inspected Aug 27, 2025