SAN BERNARDINO, CA
SAN BERNARDINO STADIUM
5 devices · 280 E ST S, SAN BERNARDINO, CA, 92401
Work history
Who worked this, and when · ProInspection
Last inspected May 1, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1996 · hydroelectric · 3,500 lb · 160 fpm · 2 stops · last inspected May 1, 2026
- Wheelchair lift · installed 1996 · screwdrive · 750 lb · 9 fpm · 2 stops · last inspected May 1, 2026
- Wheelchair lift · installed 1997 · screwdrive · 750 lb · 9 fpm · 2 stops · last inspected May 1, 2026
- Wheelchair lift · installed 1997 · screwdrive · 720 lb · 9 fpm · 3 stops · last inspected May 1, 2026
- Wheelchair lift · installed 2019 · Harmar LLC · screwdrive · 750 lb · 10 fpm · 2 stops · last inspected May 1, 2026