ANAHEIM, CA
WALNUT VILLAGE
8 devices · 891 WALNUT ST S, ANAHEIM, CA, 92802
Work history
Who worked this, and when · ProInspection
Last inspected Dec 17, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1990 · hydroelectric · 2,000 lb · 100 fpm · 2 stops · last inspected Dec 17, 2025
- Passenger · installed 2009 · TK Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 4 stops · last inspected Dec 17, 2025
- Passenger · installed 2009 · TK Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 4 stops · last inspected Dec 17, 2025
- Passenger · installed 2009 · TK Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 4 stops · last inspected Dec 17, 2025
- Passenger · installed 2009 · TK Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 3 stops · last inspected Dec 17, 2025
- Passenger · installed 2009 · TK Elevator Corporation · hydroelectric · 4,500 lb · 150 fpm · 4 stops · last inspected Dec 17, 2025
- Passenger · installed 2009 · TK Elevator Corporation · hydroelectric · 4,500 lb · 150 fpm · 4 stops · last inspected Dec 17, 2025
- Wheelchair lift · installed 2009 · Garaventa Ltd. · roped hydro · 750 lb · 17 fpm · 2 stops · last inspected Dec 17, 2025