SAN DIEGO, CA
ZENTALIS
3 devices · 10275 SCIENCE CENTER DR, SAN DIEGO, CA, 92121
Work history
Who worked this, and when · ProInspection
Last inspected Mar 11, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1997 · hydroelectric · 4,500 lb · 125 fpm · 3 stops · last inspected Mar 11, 2026
- Passenger · installed 1997 · hydroelectric · 2,500 lb · 135 fpm · 3 stops · last inspected Mar 11, 2026
- Passenger · installed 2021 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 3 stops · last inspected Mar 13, 2026