SANTA MONICA, CA
PEN FACTORY
4 devices · 1681 26TH ST, SANTA MONICA, CA, 90404
Work history
Who worked this, and when · ProInspection
Last inspected Jan 28, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2017 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 2 stops · last inspected Jan 28, 2026
- Passenger · installed 2017 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 2 stops · last inspected Jan 28, 2026
- Passenger · installed 2017 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 2 stops · last inspected Jan 28, 2026
- Passenger · installed 2017 · Schindler Elevator Corporation · hydroelectric · 4,500 lb · 150 fpm · 2 stops · last inspected Jan 28, 2026