SAN MARCOS, CA
DOUBLE PEAK SCHOOL
4 devices · 111 SAN ELIJO ROAD, SAN MARCOS, CA, 92078
Work history
Who worked this, and when · ProInspection
Last inspected Jun 26, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2016 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 2 stops · last inspected Jun 26, 2026
- Passenger · installed 2016 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 2 stops · last inspected Jun 26, 2026
- Passenger · installed 2016 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 2 stops · last inspected Jun 26, 2026
- Wheelchair lift · installed 2016 · Garaventa Ltd. · roped hydro · 750 lb · 1 fpm · 2 stops · last inspected Jun 26, 2026