SAN DIEGO, CA
TARGET M.V.
6 devices · 1288 CAMINO DEL RIO N, SAN DIEGO, CA, 92108
Work history
Who worked this, and when · ProInspection
Last inspected Oct 27, 2022
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Freight · installed 2002 · Schindler Elevator Corporation · hydroelectric · 11,000 lb · 90 fpm · 3 stops · last inspected Oct 27, 2022
- Passenger · installed 2002 · Schindler Elevator Corporation · hydroelectric · 5,000 lb · 125 fpm · 2 stops · last inspected Sep 15, 2025
- Passenger · installed 2002 · Schindler Elevator Corporation · hydroelectric · 5,000 lb · 125 fpm · 2 stops · last inspected Sep 15, 2025
- Escalator · installed 2002 · Schindler Elevator Corporation · escalator · 5,517 lb · 90 fpm · last inspected Sep 15, 2025
- Escalator · installed 2002 · Schindler Elevator Corporation · escalator · 90 fpm · last inspected Sep 15, 2025
- Passenger · installed 2002 · Schindler Elevator Corporation · hydroelectric · 9,000 lb · 100 fpm · 3 stops · last inspected Sep 15, 2025