SAN JOSE, CA
CISCO BUILDING # P
3 devices · 125 TASMAN DR W, SAN JOSE, CA, 95134
Work history
Who worked this, and when · ProInspection
Last inspected Dec 2, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1999 · hydroelectric · 4,500 lb · 125 fpm · 2 stops · last inspected Dec 2, 2025
- Other · installed 2020 · Pflow (VRC) · roped hydro · 3,000 lb · 24 fpm · 2 stops · last inspected Dec 2, 2025
- Wheelchair lift · installed 2020 · Garaventa Ltd. · roped hydro · 750 lb · 17 fpm · 2 stops · last inspected Dec 2, 2025