SAN RAFAEL, CA
101 MCINNIS PKWY
4 devices · 101 MCINNIS PKWY, SAN RAFAEL, CA, 94903
Work history
Who worked this, and when · ProInspection
Last inspected Jan 21, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1990 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 5 stops · last inspected Jun 1, 2026
- Passenger · installed 1990 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 5 stops · last inspected Jan 21, 2026
- Passenger · installed 1990 · TK Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 5 stops · last inspected Jan 21, 2026
- Passenger · installed 1990 · hydroelectric · 3,500 lb · 100 fpm · 5 stops · last inspected May 11, 2026