EL MONTE, CA
WELLS FARGO BANK
6 devices · 3440 FLAIR DR, EL MONTE, CA, 91731
Work history
Who worked this, and when · ProInspection
Last inspected May 11, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1981 · basement traction · 6,500 lb · 200 fpm · 5 stops · last inspected May 11, 2026
- Passenger · installed 1981 · basement traction · 3,500 lb · 350 fpm · 4 stops · last inspected May 11, 2026
- Passenger · KONE Inc. · basement traction · 6,000 lb · 200 fpm · 6 stops · last inspected May 11, 2026
- Passenger · basement traction · 3,000 lb · 350 fpm · 5 stops · last inspected May 11, 2026
- Passenger · installed 2002 · basement traction · 3,500 lb · 350 fpm · 5 stops · last inspected May 11, 2026
- Passenger · installed 1981 · hydroelectric · 2,500 lb · 125 fpm · 2 stops · last inspected May 11, 2026