SAN DIEGO, CA
METRO
4 devices · 5080 CAMINO DEL ARROYO, SAN DIEGO, CA, 92108
Work history
Who worked this, and when · ProInspection
Last inspected Oct 29, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2018 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 5 stops · last inspected Oct 29, 2025
- Passenger · installed 2018 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 5 stops · last inspected Oct 28, 2025
- Passenger · installed 2018 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 5 stops · last inspected Oct 28, 2025
- Passenger · installed 2018 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 150 fpm · 5 stops · last inspected Oct 29, 2025