BAKERSFIELD, CA
AERA ENERGY
4 devices · 10000 MING AV, BAKERSFIELD, CA, 93311
Work history
Who worked this, and when · ProInspection
Last inspected May 26, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1984 · hydroelectric · 4,000 lb · 150 fpm · 3 stops · last inspected May 26, 2026
- Passenger · installed 1984 · hydroelectric · 2,500 lb · 125 fpm · 3 stops · last inspected May 26, 2026
- Passenger · installed 1984 · hydroelectric · 2,500 lb · 125 fpm · 2 stops · last inspected May 26, 2026
- Passenger · installed 1999 · Delta Elevator Company, Inc. · hydroelectric · 2,500 lb · 100 fpm · 2 stops · last inspected May 26, 2026