SAN DIEGO, CA
PARKING PHASE II
5 devices · 11261 WESTVIEW PARKWAY, SAN DIEGO, CA, 92126
Work history
Who worked this, and when · ProInspection
Last inspected Sep 18, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2015 · TK Elevator Corporation · hydroelectric · 4,500 lb · 150 fpm · 6 stops · last inspected Sep 18, 2025
- Passenger · installed 2015 · TK Elevator Corporation · hydroelectric · 4,500 lb · 150 fpm · 6 stops · last inspected Nov 14, 2025
- Passenger · installed 2015 · TK Elevator Corporation · hydroelectric · 4,500 lb · 150 fpm · 6 stops · last inspected Nov 14, 2025
- Passenger · installed 2015 · TK Elevator Corporation · hydroelectric · 4,500 lb · 150 fpm · 6 stops · last inspected Sep 18, 2025
- Passenger · installed 2015 · TK Elevator Corporation · hydroelectric · 4,500 lb · 150 fpm · 6 stops · last inspected Nov 20, 2025