SAN MATEO, CA
TOWER PLAZA
6 devices · 2121 EL CAMINO REAL S, SAN MATEO, CA, 94403
Work history
Who worked this, and when · ProInspection
Last inspected Apr 13, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1973 · overhead traction · 2,500 lb · 350 fpm · 12 stops · last inspected Apr 13, 2026
- Passenger · installed 1973 · overhead traction · 2,500 lb · 350 fpm · 12 stops · last inspected Apr 13, 2026
- Passenger · installed 1973 · overhead traction · 2,000 lb · 350 fpm · 12 stops · last inspected Apr 13, 2026
- Passenger · installed 1973 · hydroelectric · 2,000 lb · 125 fpm · 5 stops · last inspected Apr 13, 2026
- Passenger · installed 1980 · hydroelectric · 3,500 lb · 100 fpm · 2 stops · last inspected Apr 13, 2026
- Wheelchair lift · installed 2000 · 750 lb · 9 fpm · 2 stops · last inspected Apr 13, 2026