MENLO PARK, CA
EXPONENT FAILURE ANALYSIS ASSOC.
3 devices · 149 COMMONWEALTH DR, MENLO PARK, CA, 94025
Work history
Who worked this, and when · ProInspection
Last inspected Jul 10, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1989 · hydroelectric · 3,500 lb · 125 fpm · 3 stops · last inspected Jul 10, 2026
- Passenger · installed 1989 · hydroelectric · 2,500 lb · 125 fpm · 3 stops · last inspected Jul 10, 2026
- Passenger · installed 1989 · hydroelectric · 3,500 lb · 125 fpm · 3 stops · last inspected Jul 10, 2026