SAN DIEGO, CA
ALL-RIGHT STORAGE
3 devices · 1651 OTAY HEIGHTS CT, SAN DIEGO, CA, 92154
Work history
Who worked this, and when · ProInspection
Last inspected Jun 17, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2009 · TK Elevator Corporation · hydroelectric · 5,000 lb · 100 fpm · 3 stops · last inspected Jun 17, 2026
- Passenger · installed 2009 · TK Elevator Corporation · hydroelectric · 5,000 lb · 100 fpm · 3 stops · last inspected Jun 17, 2026
- Passenger · installed 2009 · TK Elevator Corporation · hydroelectric · 5,000 lb · 100 fpm · 3 stops · last inspected Jun 17, 2026