SAN DIEGO, CA
DAYS INN
5 devices · 543 HOTEL CIRCLE S, SAN DIEGO, CA, 92108
Work history
Who worked this, and when · ProInspection
Last inspected Dec 4, 2024
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1976 · hydroelectric · 2,000 lb · 125 fpm · 3 stops · last inspected Aug 9, 2024
- Passenger · installed 1976 · hydroelectric · 2,000 lb · 125 fpm · 3 stops · last inspected Aug 9, 2024
- Passenger · installed 1978 · hydroelectric · 2,000 lb · 125 fpm · 3 stops · last inspected Aug 9, 2024
- Passenger · installed 1978 · hydroelectric · 2,000 lb · 125 fpm · 3 stops · last inspected Aug 9, 2024
- Passenger · installed 1985 · hydroelectric · 2,000 lb · 125 fpm · 4 stops · last inspected Dec 4, 2024