SAN FRANCISCO, CA
SF Marriott Fisherman's Wharf
6 devices · 1250 COLUMBUS AV, SAN FRANCISCO, CA, 94133
Work history
Who worked this, and when · ProInspection
Last inspected Jan 5, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · overhead traction · 2,500 lb · 350 fpm · 6 stops · last inspected Jan 5, 2026
- Passenger · installed 2008 · KONE Inc. · overhead traction · 2,500 lb · 350 fpm · 6 stops · last inspected Jan 5, 2026
- Passenger · installed 1983 · hydroelectric · 3,500 lb · 150 fpm · 6 stops · last inspected Jan 5, 2026
- Wheelchair lift · installed 2006 · Garaventa Ltd. · roped hydro · 750 lb · 17 fpm · 2 stops · last inspected Jan 5, 2026
- Wheelchair lift · installed 2011 · National W heet-Vator Co. · screwdrive · 750 lb · 9 fpm · 2 stops · last inspected Jan 5, 2026
- Wheelchair lift · installed 2017 · Garaventa Ltd. · roped hydro · 750 lb · 17 fpm · 2 stops · last inspected Jan 5, 2026