SAN DIEGO, CA
PACIFIC PLAZA
3 devices · 10945 VISTA SORRENTO PKY, SAN DIEGO, CA, 92130
Work history
Who worked this, and when · ProInspection
Last inspected Dec 20, 2024
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2001 · hydroelectric · 3,500 lb · 150 fpm · 4 stops · last inspected Dec 20, 2024
- Passenger · installed 2001 · hydroelectric · 3,500 lb · 150 fpm · 4 stops · last inspected Dec 20, 2024
- Passenger · installed 2001 · hydroelectric · 3,500 lb · 150 fpm · 4 stops · last inspected Dec 20, 2024