PALM DESERT, CA
THE FOUNTAINS AT THE CARLOTTA
4 devices · 41-505 CARLOTTA DR, PALM DESERT, CA, 92211
Work history
Who worked this, and when · ProInspection
Last inspected Oct 30, 2025
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1985 · hydroelectric · 4,000 lb · 115 fpm · 2 stops · last inspected Dec 15, 2025
- Passenger · installed 1985 · hydroelectric · 4,000 lb · 115 fpm · 2 stops · last inspected Oct 30, 2025
- Passenger · installed 1985 · hydroelectric · 4,000 lb · 115 fpm · 3 stops · last inspected Oct 30, 2025
- Passenger · hydroelectric · 4,000 lb · 115 fpm · 2 stops · last inspected Oct 30, 2025