SANTA CLARA, CA
MARVELL SEMICONDUCTOR
3 devices · 5450 MARVELL LN, SANTA CLARA, CA, 95054
Work history
Who worked this, and when · ProInspection
Last inspected Sep 20, 2024
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1995 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 125 fpm · 2 stops · last inspected Sep 20, 2024
- Passenger · installed 1995 · Schindler Elevator Corporation · hydroelectric · 3,500 lb · 125 fpm · 2 stops · last inspected Sep 20, 2024
- Passenger · installed 1995 · Schindler Elevator Corporation · hydroelectric · 4,000 lb · 125 fpm · 2 stops · last inspected Sep 20, 2024