SAN JOSE, CA
CCOC BLDG
3 devices · 760 HILLSDALE AV, SAN JOSE, CA, 95136
Work history
Who worked this, and when · ProInspection
Last inspected Nov 9, 2022
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Wheelchair lift · installed 2010 · Porch-Lift · roped hydro · 750 lb · 21 fpm · 2 stops · last inspected Oct 17, 2022
- Wheelchair lift · installed 2011 · Porch-Lift · hydroelectric · 750 lb · 20 fpm · 2 stops · last inspected Oct 17, 2022
- Wheelchair lift · installed 2013 · Porch-Lift · roped hydro · 750 lb · 21 fpm · 2 stops · last inspected Nov 9, 2022