FULLERTON, CA
RAYTHEON SYSTEMS COMPANY
6 devices · 1801 HUGHES DR, FULLERTON, CA, 92833
Work history
Who worked this, and when · ProInspection
Last inspected Jun 16, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 1986 · hydroelectric · 3,500 lb · 125 fpm · 4 stops · last inspected Jun 16, 2026
- Passenger · installed 1986 · hydroelectric · 3,500 lb · 125 fpm · 3 stops · last inspected Jun 16, 2026
- Passenger · installed 1986 · hydroelectric · 3,500 lb · 125 fpm · 3 stops · last inspected Jun 16, 2026
- Passenger · installed 1986 · hydroelectric · 3,500 lb · 125 fpm · 3 stops · last inspected Jun 16, 2026
- Passenger · installed 1986 · hydroelectric · 3,500 lb · 125 fpm · 4 stops · last inspected Jun 16, 2026
- Passenger · installed 1986 · hydroelectric · 3,500 lb · 125 fpm · 3 stops · last inspected Jun 16, 2026