SAN FRANCISCO, CA
THE UNIVERSAL CHURCH
3 devices · 3541 20TH STREET, SAN FRANCISCO, CA, 94110
Work history
Who worked this, and when · ProInspection
Last inspected Jul 3, 2024
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Wheelchair lift · installed 2017 · Garaventa Ltd. · roped hydro · 750 lb · 17 fpm · 2 stops · last inspected Mar 15, 2024
- Wheelchair lift · installed 2017 · Garaventa Ltd. · roped hydro · 750 lb · 17 fpm · 2 stops · last inspected Jul 3, 2024
- Passenger · installed 2018 · TK Elevator Corporation · hydroelectric · 2,100 lb · 100 fpm · 2 stops · last inspected Mar 15, 2024