SAN FRANCISCO, CA
1410 STEINER ST
4 devices · 1410 STEINER ST, SAN FRANCISCO, CA, 94115
Work history
Who worked this, and when · ProInspection
Last inspected Sep 7, 2024
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · overhead traction · 3,000 lb · 350 fpm · 10 stops · last inspected Sep 7, 2024
- Passenger · installed 1988 · overhead traction · 2,500 lb · 350 fpm · 10 stops · last inspected Sep 7, 2024
- Passenger · installed 1990 · hydroelectric · 2,500 lb · 125 fpm · 3 stops · last inspected Sep 9, 2024
- Passenger · installed 1990 · hydroelectric · 2,500 lb · 125 fpm · 3 stops · last inspected Sep 9, 2024