SAN FRANCISCO, CA
First Baptist Church
3 devices · 22 WALLER ST, SAN FRANCISCO, CA, 94102
Work history
Who worked this, and when · ProInspection
Last inspected Apr 30, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Wheelchair lift · installed 2016 · Garaventa Ltd. · chain · 750 lb · 17 fpm · 2 stops · last inspected Apr 30, 2026
- Wheelchair lift · installed 2017 · Garaventa Ltd. · chain · 750 lb · 17 fpm · 2 stops · last inspected Apr 30, 2026
- Wheelchair lift · installed 2017 · Garaventa Ltd. · chain · 750 lb · 17 fpm · 2 stops · last inspected Apr 30, 2026