SAN DIEGO, CA
CANYON CREST ACADEMY
8 devices · 5951 VILLAGE CENTER LOOP ROAD, SAN DIEGO, CA, 92130
Work history
Who worked this, and when · ProInspection
Last inspected Feb 24, 2026
Inspection history over time · ProMarket status
Warranty window and signs of trouble · ProDevices
- Passenger · installed 2005 · TK Elevator Corporation · hydroelectric · 2,500 lb · 125 fpm · 2 stops · last inspected Feb 20, 2026
- Passenger · installed 2006 · TK Elevator Corporation · hydroelectric · 2,500 lb · 125 fpm · 2 stops · last inspected Feb 20, 2026
- Passenger · installed 2006 · TK Elevator Corporation · hydroelectric · 2,500 lb · 126 fpm · 3 stops · last inspected Feb 20, 2026
- Passenger · installed 2006 · TK Elevator Corporation · hydroelectric · 2,500 lb · 125 fpm · 2 stops · last inspected Feb 20, 2026
- Passenger · installed 2006 · TK Elevator Corporation · hydroelectric · 2,500 lb · 125 fpm · 2 stops · last inspected Feb 24, 2026
- Wheelchair lift · installed 2006 · Garaventa Ltd. · roped hydro · 750 lb · 17 fpm · 2 stops · last inspected Feb 20, 2026
- Wheelchair lift · installed 2006 · Garaventa Ltd. · roped hydro · 750 lb · 17 fpm · 2 stops · last inspected Feb 20, 2026
- Passenger · installed 2017 · KONE Inc. · overhead traction · 3,500 lb · 150 fpm · 2 stops · last inspected Feb 20, 2026